Send us photos and your open items list. Get a written findings report within 24 hours — before your inspector or auditor does.
Construction, energy, manufacturing, fleet — any industry with field inspections.
$500, one time · Nothing new, no charge · You keep the report either way
Prepared for Acme Mechanical Inc.
Penetration seal not matching approved submittal
Checked against: Company SOP 4.2
Fastener pattern deviates from manufacturer data
Checked against: Project Spec 08-31
Clearance below required minimum at panel
Checked against: Applicable Standard
Page 1 of 4
Trusted by teams at
Submit your job, and our patent-pending AI technology analyzes every photo against your standards, specs, and existing tracking.
Project name, address, and primary trade or discipline. We look up the applicable standards and regulations automatically from the address.
Upload directly, share a Drive/Dropbox link, or email them over. Your existing list sets the bar — anything already on it doesn't count as a finding.
Cross-references each image against your specs, the applicable standards, and your existing tracking — flagging deviations your list missed.
Each finding includes the photo, the exact location, and the code section or spec it deviates from. Sorted by severity so you know what to fix first.
Code Buddy is an AI-powered compliance platform used by thousands of field professionals across construction, energy, manufacturing, and fleet operations. Our patent-pending technology checks job site photos against codes, specs, and standards — the same technology that powers this report.
Built for the people who actually do the work.
Inspections completed
Trades supported
Report turnaround
If nothing new found
Real findings from past reports. Each one includes the photo, the exact location, and the code section it deviates from.
Flashing detail at balcony-to-wall transition doesn't match approved submittal — spec deviation
Cable tray fill exceeds company standard (40% max) by 12% in Row C — internal SOP violation
Ceiling tile gap at smoke partition doesn't meet facility's infection control risk assessment — ICRA protocol
Emergency eyewash station blocked by staged materials — OSHA 29 CFR 1910.151(c)
Fire damper access panel installed behind finished drywall — won't pass fire marshal walkthrough
Module spacing on south array doesn't match manufacturer's wind load table for Exposure C — spec deviation
And only if we find something that wasn't already on your list.
If everything we flag was already on your list, you pay nothing. You keep the report either way.
No. This is a pre-inspection review — a second set of eyes before the official one. Your inspector or auditor still does their job. We help you show up ready.
Every finding cites the specific code section or spec it deviates from. If you disagree, you have the reference to check it yourself. We'd rather over-flag than miss something.
Construction (all trades), energy, manufacturing, fleet operations, and safety. If your industry isn't listed, tell us — we likely support it or can onboard your standards quickly.
We look up the applicable codes and regulations from your project address and trade. If you have specific standards, SOPs, or specs, upload those and we check against them instead.
Encrypted in transit and at rest. Used only to produce your report. Never shared. You can request deletion anytime after delivery.